Replace the entire main sewer system situated under the manufacturing plant, without interrupting production.


Built an underground labyrinth allowing access to the sewer system via various sections and replaced them. All this was done while production continued undisturbed.


Since there was no temporary moving of operations, major savings were made. No work stoppages!