Relocate a US confection industry's equipment in a Montreal existing
plant without interrupting operations.

Phase the project in such way that production could go on simultaneously
in both countries at some times during transfer of operations. Five
lines of production were being transferred one at time.

Regular operations in Montreal went on while never more then two lines
of production from transfer were shut down at the same time. Allowing
thus the company to produce as usual without major market share loss.